CNC Metalcraft® Fabrication
If your Nevada project needs composite panels, plate or column covers made to drawings, this page covers how we fabricate them and how they get to the site. CNC Metalcraft® was founded in 2005 and works out of over 75,000 sq ft across two Burnsville, MN buildings.
Request a QuoteCall 888.938.3356For panel system details, the Sure-Panel® Nevada page is the place to start. Everything below is about how CNC Metalcraft® builds and ships the order.
By our estimate a truck covers about 1,690 miles to reach Carson City, roughly 4 days on the road. These are planning estimates only, not a carrier quote; the actual route, carrier and pickup date will change them.
On that measure Nevada ranks 45th closest of the 48 contiguous states to our shop; among its neighbors, Utah is nearest to us (about 1,180 miles to its capital, also an estimate).
Nevada is one of our longer truck routes. Add the transit days to the schedule early, and plan for crates to be staged on site for a while.
For commercial buildings, the DOE Building Energy Codes Program shows 2024 IECC and ASHRAE 90.1-2022 in Nevada, effective August 18, 2024, with enforcement listed as Jurisdictional. For residential work DOE lists 2024 IECC (start date August 18, 2024).
On the 2021 IECC climate map (PNNL-33270), Nevada runs from zone 3 to zone 5: 1 county in zone 3, 7 counties in zone 4 and 9 in zone 5. Examples from the county tables: Clark County, zone 3; Nye County, zone 4; Churchill County, zone 5.
These figures come from DOE and PNNL as of November 2026 and can trail recent state updates. The architect and the Nevada code official have the final word; we fabricate to what they approve.
Questions from the Nevada installation crew about marks or drawings can come straight to the shop during business hours, Monday through Friday, 7 to 4.
ACM fabrication starts at $6/SF (fabrication only). Full project pricing depends on the system, size, finish and schedule, and we quote it from drawings, with freight to Nevada priced separately.
With approved fabrication drawings from you, fabrication takes 3 to 4 weeks. If we prepare the drafting, production takes about 6 to 8 weeks from the approval of our shop drawings. Then add freight: we estimate about 4 days by truck to Carson City. Transit figures are estimates, not a carrier quote.
DOE lists 2024 IECC and ASHRAE 90.1-2022 for Nevada commercial buildings, effective August 18, 2024, with enforcement shown as Jurisdictional. Confirm the current edition with the local code official.
System options, joints and specs are on the Sure-Panel® Nevada page at sure-panel.com. CNC Metalcraft® fabricates those systems and handles the shop drawings, crating and freight.
Nearby fabrication pages: Arizona, California, Idaho, Oregon, Utah. All states: metal panel fabrication by state.
Send drawings through request a quote or call (952) 938-3356 (toll free 888.938.3356). Shop hours are Monday through Friday, 7 to 4. CNC Metalcraft®, 11901 Riverwood Dr, Burnsville, MN 55337.
Request a Quote