---
title: California Metal Panel Fabrication | CNC Metalcraft®
description: ACM, plate and column covers fabricated in Burnsville, MN and crated for California. About 1,810 mi to Sacramento (estimate). Lead times and quotes.
image: https://cncmetalcraft.com/hubfs/DSC016303_seamless-2048x1366.jpeg
---

Call us Today! [**888.938.3356**](tel:8889383356)

[![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png) ![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png)](https://cncmetalcraft.com?hsLang=en)

[![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png)](https://cncmetalcraft.com?hsLang=en)

<https://cncmetalcraft.com/metal-panel-fabrication/california#navbar_global>

- Systems 
    - [All Products](https://cncmetalcraft.com/our-products?hsLang=en)
    - [Composite Panel Systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en)
    - [Plate Panel Systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en)
    - [Column Cover Systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en)
    - [Sure-Panel® S-Lock Tile Panel System](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en)
    - [Phenolic](https://cncmetalcraft.com/phenolic?hsLang=en)
- [Custom Fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en)
- Our Work 
    - [View All Our Work](https://cncmetalcraft.com/our-work?hsLang=en)
    - [Composite Panel Gallery](https://cncmetalcraft.com/our-work/tag/composite-panel-gallery?hsLang=en)
    - [Plate Panel Gallery](https://cncmetalcraft.com/our-work/tag/plate-panel-gallery?hsLang=en)
    - [Column Covers Gallery](https://cncmetalcraft.com/our-work/tag/column-covers-gallery?hsLang=en)
    - [Tile Panel Gallery](https://cncmetalcraft.com/our-work/tag/tile-panel-gallery?hsLang=en)
    - [Phenolic Gallery](https://cncmetalcraft.com/our-work/tag/phenolic-gallery?hsLang=en)
- [About Us](https://cncmetalcraft.com/about-us?hsLang=en)
- [Contact](https://cncmetalcraft.com/contact-us?hsLang=en)

- Systems 
    - [All Products](https://cncmetalcraft.com/our-products?hsLang=en)
    - [Composite Panel Systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en)
    - [Plate Panel Systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en)
    - [Column Cover Systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en)
    - [Sure-Panel® S-Lock Tile Panel System](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en)
    - [Phenolic](https://cncmetalcraft.com/phenolic?hsLang=en)
- [Custom Fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en)
- Our Work 
    - [View All Our Work](https://cncmetalcraft.com/our-work?hsLang=en)
    - [Composite Panel Gallery](https://cncmetalcraft.com/our-work/tag/composite-panel-gallery?hsLang=en)
    - [Plate Panel Gallery](https://cncmetalcraft.com/our-work/tag/plate-panel-gallery?hsLang=en)
    - [Column Covers Gallery](https://cncmetalcraft.com/our-work/tag/column-covers-gallery?hsLang=en)
    - [Tile Panel Gallery](https://cncmetalcraft.com/our-work/tag/tile-panel-gallery?hsLang=en)
    - [Phenolic Gallery](https://cncmetalcraft.com/our-work/tag/phenolic-gallery?hsLang=en)
- [About Us](https://cncmetalcraft.com/about-us?hsLang=en)
- [Contact](https://cncmetalcraft.com/contact-us?hsLang=en)

CNC Metalcraft® Fabrication

# Metal Panel Fabrication and Shipping to California

Founded in 2005, CNC Metalcraft® fabricates architectural metal in over 75,000 sq ft across two Burnsville, MN buildings. For California projects we handle the shop side, from shop drawings through crating, and coordinate the freight to the jobsite.

[Request a Quote](https://cncmetalcraft.com/request-a-quote?hsLang=en)[Call 888.938.3356](tel:+18889383356)

■ Founded 2005■ 75,000+ sq ft in Burnsville, MN■ Column covers up to 15 ft■ Ships nationwide

## What our shop makes for California buildings

- **Extrusions and trim**: architectural extrusions, including the Sure-Panel® aluminum extrusion system the rainscreen panels hang on.
- **Custom metal**: shearing, bending, notching, rolling, punching and welding, and we can shear, form and roll material up to 16 ft. See [custom fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en).
- **Composite (ACM/MCM) panels**, flat or radius, cut on CNC routers from Alucobond, Alfrex, Reynobond, Etalbond or ALPOLIC sheet. More on [composite panel systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en).
- **Solid aluminum plate** (not a laminate) in .063 to .250 in. gauges, with perforated and stainless versions made in the same shop. More on [plate panel systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en).
- **Column covers and beam wraps**, one piece up to 15 ft tall, stacked in marked sections beyond that. More on [column cover systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en).

Joint types, specs and system choices for California are covered on the [Sure-Panel® California page](https://www.sure-panel.com/california-metal-panels). This page stays on the shop and the shipping.

## Getting crates to California

Sacramento is roughly 1,810 miles from our dock by road, which works out to about 4 days of transit. *These are planning estimates only, not a carrier quote; the actual route, carrier and pickup date will change them.*

On that measure California ranks 48th closest of the 48 contiguous states to our shop; among its neighbors, Arizona is nearest to us (about 1,520 miles to its capital, also an estimate).

California is one of our longer truck routes. Add the transit days to the schedule early, and plan for crates to be staged on site for a while.

## California energy code and climate facts

For commercial buildings, the [DOE Building Energy Codes Program](https://www.energycodes.gov/status/states/california) shows 2025 Building Energy Efficiency Standards in California, effective January 1, 2026, with enforcement listed as Mandatory Statewide. For residential work DOE lists 2025 Building Energy Efficiency Standards (start date January 1, 2026).

On the 2021 IECC climate map (PNNL-33270), California runs from zone 2 to zone 6: 1 county in zone 2, 39 counties in zone 3, 10 counties in zone 4, 6 counties in zone 5 and 2 in zone 6. Examples from the county tables: Imperial County, zone 2; Del Norte County, zone 4; Alpine County, zone 6.

Parts of California sit in zone 6 or colder. For winter deliveries there, keep crates closed and the protective film on until the panels are in a heated space, because moving material between temperature extremes can cause condensation.

These figures come from DOE and PNNL as of November 2026 and can trail recent state updates. The architect and the California code official have the final word; we fabricate to what they approve.

## How a California order moves through the shop

1. **Share the bid set.** Elevations, panel areas, finish and the delivery location are enough to start a quote.
2. **Drafting and approval.** If drafting is in our scope, our team prepares shop drawings, and production starts once they come back approved.
3. **Fabrication.** If you supply approved fabrication drawings, fabrication takes 3 to 4 weeks. When we do the drafting, production runs about 6 to 8 weeks from approval of our shop drawings.
4. **Marking and crating.** Parts are marked to the shop drawings and packed to protect finished faces and returns.
5. **Freight and delivery.** We coordinate the shipment to your site and the delivery window.

Questions from the California installation crew about marks or drawings can come straight to the shop during business hours, Monday through Friday, 7 to 4.

## When the truck arrives

- Inspect crates before the driver leaves, count them against the packing list, and note and photograph any damage on the delivery paperwork.
- Confirm truck access and unloading equipment before the ship date.
- Ask for deliveries by elevation or phase so crates are not stored on site longer than needed.
- On long routes, add the transit days to the schedule before you set the install date.

## Cost

ACM fabrication starts at $6/SF (fabrication only). Full project pricing depends on the system, size, finish and schedule, and we quote it from drawings, with freight to California priced separately.

## California fabrication FAQ

### How long does it take to fabricate and ship panels to California?

Plan on 3 to 4 weeks of fabrication when you provide approved fabrication drawings, or about 6 to 8 weeks of production, starting at shop drawing approval, when CNC Metalcraft® does the drafting. Then add freight: we estimate about 4 days by truck to Sacramento. Transit figures are estimates, not a carrier quote.

### Which energy code does DOE list for California commercial buildings?

DOE lists 2025 Building Energy Efficiency Standards for California commercial buildings, effective January 1, 2026, with enforcement shown as Mandatory Statewide. Confirm the current edition with the local code official.

### Can column covers taller than 15 ft ship to California?

Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts.

Nearby fabrication pages: [Arizona](https://cncmetalcraft.com/metal-panel-fabrication/arizona?hsLang=en), [Nevada](https://cncmetalcraft.com/metal-panel-fabrication/nevada?hsLang=en), [Oregon](https://cncmetalcraft.com/metal-panel-fabrication/oregon?hsLang=en). All states: [metal panel fabrication by state](https://cncmetalcraft.com/metal-panel-fabrication?hsLang=en).

## Request a quote for a California project

Send plans through our [quote request page](https://cncmetalcraft.com/request-a-quote?hsLang=en), or phone (952) 938-3356 / 888.938.3356, Monday to Friday from 7 to 4. You can also see finished buildings on [our work](https://cncmetalcraft.com/our-work?hsLang=en). CNC Metalcraft®, 11901 Riverwood Dr, Burnsville, MN 55337.

[Request a Quote](https://cncmetalcraft.com/request-a-quote?hsLang=en)

[![CNCmetalcraft-logo](https://cncmetalcraft.com/hubfs/CNCmetalcraft-logo.png)](https://cncmetalcraft.com?hsLang=en)

11901 Riverwood Dr  
Burnsville, MN 55337

- <https://www.facebook.com/CNCMetalcraft/>
- <https://www.instagram.com/cncmetalcraft/>
- <https://www.linkedin.com/company/cnc-metalcraft/>

### Quick Links

- [Leed](https://cncmetalcraft.com/leed)
- [Resources](https://cncmetalcraft.com/resources)
- [Documentation](https://cncmetalcraft.com/documentation)

### Stay in Touch

Copyright © 2026 CNC Metalcraft | All rights reserved | [Privacy Policy](https://cncmetalcraft.com/privacy-policy?hsLang=en) | [Terms of Use](https://cncmetalcraft.com/terms-and-conditions-of-use?hsLang=en) 

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://cncmetalcraft.com/metal-panel-fabrication/california#service",
  "@type" : "Service",
  "areaServed" : {
    "@type" : "State",
    "containedInPlace" : {
      "@type" : "Country",
      "name" : "United States"
    },
    "name" : "California"
  },
  "description" : "ACM, plate and column covers fabricated in Burnsville, MN and crated for California. About 1,810 mi to Sacramento (estimate). Lead times and quotes.",
  "name" : "Architectural metal panel fabrication for California projects",
  "provider" : {
    "@id" : "https://cncmetalcraft.com/#org",
    "@type" : "LocalBusiness",
    "address" : {
      "@type" : "PostalAddress",
      "addressCountry" : "US",
      "addressLocality" : "Burnsville",
      "addressRegion" : "MN",
      "postalCode" : "55337",
      "streetAddress" : "11901 Riverwood Dr"
    },
    "name" : "CNC Metalcraft",
    "telephone" : "+1-952-938-3356",
    "url" : "https://cncmetalcraft.com/"
  },
  "serviceType" : "Architectural metal panel fabrication",
  "url" : "https://cncmetalcraft.com/metal-panel-fabrication/california"
}
```

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://cncmetalcraft.com/metal-panel-fabrication/california#faq",
  "@type" : "FAQPage",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Plan on 3 to 4 weeks of fabrication when you provide approved fabrication drawings, or about 6 to 8 weeks of production, starting at shop drawing approval, when CNC Metalcraft® does the drafting. Then add freight: we estimate about 4 days by truck to Sacramento. Transit figures are estimates, not a carrier quote."
    },
    "name" : "How long does it take to fabricate and ship panels to California?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "DOE lists 2025 Building Energy Efficiency Standards for California commercial buildings, effective January 1, 2026, with enforcement shown as Mandatory Statewide. Confirm the current edition with the local code official."
    },
    "name" : "Which energy code does DOE list for California commercial buildings?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts."
    },
    "name" : "Can column covers taller than 15 ft ship to California?"
  } ],
  "url" : "https://cncmetalcraft.com/metal-panel-fabrication/california"
}
```