CNC Metalcraft® Fabrication

Metal Panel Fabrication and Shipping to Nevada

If your Nevada project needs composite panels, plate or column covers made to drawings, this page covers how we fabricate them and how they get to the site. CNC Metalcraft® was founded in 2005 and works out of over 75,000 sq ft across two Burnsville, MN buildings.

Request a QuoteCall 888.938.3356
■ Founded 2005■ 75,000+ sq ft in Burnsville, MN■ Column covers up to 15 ft■ Ships nationwide

What we fabricate for Nevada jobs

  • Custom sheet-metal work such as trim, closures and one-off parts; the shop can shear, form and roll pieces up to 16 ft long. More on custom fabrication.
  • Composite (ACM/MCM) panels, flat or radius, cut on CNC routers from Alucobond, Alfrex, Reynobond, Etalbond or ALPOLIC sheet. More on composite panel systems.
  • Aluminum plate: solid sheet from .063 to .250 in., with stainless options and perforated plate when the design calls for it. See plate panel systems.
  • Column covers and beam wraps: made up to 15 ft in a single piece; taller columns get a stack joint. See column cover systems.
  • Extrusion packages that ship with the panels, including the Sure-Panel® rainscreen extrusion system.

For panel system details, the Sure-Panel® Nevada page is the place to start. Everything below is about how CNC Metalcraft® builds and ships the order.

Getting crates to Nevada

By our estimate a truck covers about 1,690 miles to reach Carson City, roughly 4 days on the road. These are planning estimates only, not a carrier quote; the actual route, carrier and pickup date will change them.

On that measure Nevada ranks 45th closest of the 48 contiguous states to our shop; among its neighbors, Utah is nearest to us (about 1,180 miles to its capital, also an estimate).

Nevada is one of our longer truck routes. Add the transit days to the schedule early, and plan for crates to be staged on site for a while.

Nevada energy code and climate facts

For commercial buildings, the DOE Building Energy Codes Program shows 2024 IECC and ASHRAE 90.1-2022 in Nevada, effective August 18, 2024, with enforcement listed as Jurisdictional. For residential work DOE lists 2024 IECC (start date August 18, 2024).

On the 2021 IECC climate map (PNNL-33270), Nevada runs from zone 3 to zone 5: 1 county in zone 3, 7 counties in zone 4 and 9 in zone 5. Examples from the county tables: Clark County, zone 3; Nye County, zone 4; Churchill County, zone 5.

These figures come from DOE and PNNL as of November 2026 and can trail recent state updates. The architect and the Nevada code official have the final word; we fabricate to what they approve.

How a Nevada order moves through the shop

  1. Share the bid set. Elevations, panel areas, finish and the delivery location are enough to start a quote.
  2. Drafting and approval. If drafting is in our scope, our team prepares shop drawings, and production starts once they come back approved.
  3. Lead time. Approved fabrication drawings from your team: 3 to 4 weeks of fabrication. Drafting by our team: roughly 6 to 8 weeks of production once our shop drawings are approved.
  4. Marking and crating. Parts are marked to the shop drawings and packed to protect finished faces and returns.
  5. Freight and delivery. We coordinate the shipment to your site and the delivery window.

Questions from the Nevada installation crew about marks or drawings can come straight to the shop during business hours, Monday through Friday, 7 to 4.

Site receiving checklist

  • Inspect crates before the driver leaves, count them against the packing list, and note and photograph any damage on the delivery paperwork.
  • Leave panels crated until the crew is ready to hang them.
  • Time each drop to the install sequence so material spends as little time on site as possible.
  • On long routes, add the transit days to the schedule before you set the install date.

Cost

ACM fabrication starts at $6/SF (fabrication only). Full project pricing depends on the system, size, finish and schedule, and we quote it from drawings, with freight to Nevada priced separately.

Nevada fabrication FAQ

How long does it take to fabricate and ship panels to Nevada?

With approved fabrication drawings from you, fabrication takes 3 to 4 weeks. If we prepare the drafting, production takes about 6 to 8 weeks from the approval of our shop drawings. Then add freight: we estimate about 4 days by truck to Carson City. Transit figures are estimates, not a carrier quote.

Which energy code does DOE list for Nevada commercial buildings?

DOE lists 2024 IECC and ASHRAE 90.1-2022 for Nevada commercial buildings, effective August 18, 2024, with enforcement shown as Jurisdictional. Confirm the current edition with the local code official.

Where are Sure-Panel® system details for Nevada?

System options, joints and specs are on the Sure-Panel® Nevada page at sure-panel.com. CNC Metalcraft® fabricates those systems and handles the shop drawings, crating and freight.

Nearby fabrication pages: Arizona, California, Idaho, Oregon, Utah. All states: metal panel fabrication by state.

Request a quote for a Nevada project

Send drawings through request a quote or call (952) 938-3356 (toll free 888.938.3356). Shop hours are Monday through Friday, 7 to 4. CNC Metalcraft®, 11901 Riverwood Dr, Burnsville, MN 55337.

Request a Quote