CNC Metalcraft® Fabrication
Alabama architects and contractors send us drawings; we return fabricated, labeled metal in crates built for the trip to Montgomery or wherever the site is. CNC Metalcraft® has run its shop since 2005 in over 75,000 sq ft across two Burnsville, MN buildings.
Request a QuoteCall 888.938.3356Joint types, specs and system choices for Alabama are covered on the Sure-Panel® Alabama page. This page stays on the shop and the shipping.
By our estimate a truck covers about 1,120 miles to reach Montgomery, roughly 3 days on the road. These are planning estimates only, not a carrier quote; the actual route, carrier and pickup date will change them.
On that measure Alabama ranks 25th closest of the 48 contiguous states to our shop; among its neighbors, Tennessee is nearest to us (about 820 miles to its capital, also an estimate).
With a trip this long, fewer, fuller deliveries usually make more sense than many small ones. Plan site storage for whatever arrives ahead of the installers in Alabama.
For commercial buildings, the DOE Building Energy Codes Program shows ASHRAE 90.1-2013 in Alabama, effective January 1, 2016, with enforcement listed as Mandatory Statewide. For residential work DOE lists 2015 IECC (start date October 1, 2016).
On the 2021 IECC climate map (PNNL-33270), Alabama runs from zone 2 to zone 3: 9 counties in zone 2 and 58 in zone 3. Examples from the county tables: Houston County, zone 2; Sumter County, zone 3.
These figures come from DOE and PNNL as of November 2026 and can trail recent state updates. The architect and the Alabama code official have the final word; we fabricate to what they approve.
Questions from the Alabama installation crew about marks or drawings can come straight to the shop during business hours, Monday through Friday, 7 to 4.
ACM fabrication starts at $6/SF (fabrication only). Full project pricing depends on the system, size, finish and schedule, and we quote it from drawings, with freight to Alabama priced separately.
It depends on who draws the job. Send approved fabrication drawings and fabrication takes 3 to 4 weeks; have us do the drafting and production runs about 6 to 8 weeks once you approve our shop drawings. Then add freight: we estimate about 3 days by truck to Montgomery. Transit figures are estimates, not a carrier quote.
DOE lists ASHRAE 90.1-2013 for Alabama commercial buildings, effective January 1, 2016, with enforcement shown as Mandatory Statewide. Confirm the current edition with the local code official.
Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts.
Nearby fabrication pages: Florida, Georgia, Mississippi, Tennessee. All states: metal panel fabrication by state.
Send drawings through request a quote or call (952) 938-3356 (toll free 888.938.3356). Shop hours are Monday through Friday, 7 to 4. CNC Metalcraft®, 11901 Riverwood Dr, Burnsville, MN 55337.
Request a Quote