title: West Virginia Metal Panel Fabrication | CNC Metalcraft®
description: ACM, plate and column covers fabricated in Burnsville, MN and crated for West Virginia. About 900 mi to Charleston (estimate). Lead times and quotes.
---

Call us Today! [**888.938.3356**](tel:8889383356)

[![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png) ![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png)](https://cncmetalcraft.com?hsLang=en)

[![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png)](https://cncmetalcraft.com?hsLang=en)

<https://cncmetalcraft.com/metal-panel-fabrication/west-virginia#navbar_global>

- Systems 
    - [All Products](https://cncmetalcraft.com/our-products?hsLang=en)
    - [Composite Panel Systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en)
    - [Plate Panel Systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en)
    - [Column Cover Systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en)
    - [Sure-Panel® S-Lock Tile Panel System](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en)
    - [Phenolic](https://cncmetalcraft.com/phenolic?hsLang=en)
- [Custom Fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en)
- Our Work 
    - [View All Our Work](https://cncmetalcraft.com/our-work?hsLang=en)
    - [Composite Panel Gallery](https://cncmetalcraft.com/our-work/tag/composite-panel-gallery?hsLang=en)
    - [Plate Panel Gallery](https://cncmetalcraft.com/our-work/tag/plate-panel-gallery?hsLang=en)
    - [Column Covers Gallery](https://cncmetalcraft.com/our-work/tag/column-covers-gallery?hsLang=en)
    - [Tile Panel Gallery](https://cncmetalcraft.com/our-work/tag/tile-panel-gallery?hsLang=en)
    - [Phenolic Gallery](https://cncmetalcraft.com/our-work/tag/phenolic-gallery?hsLang=en)
- [About Us](https://cncmetalcraft.com/about-us?hsLang=en)
- [Contact](https://cncmetalcraft.com/contact-us?hsLang=en)

- Systems 
    - [All Products](https://cncmetalcraft.com/our-products?hsLang=en)
    - [Composite Panel Systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en)
    - [Plate Panel Systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en)
    - [Column Cover Systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en)
    - [Sure-Panel® S-Lock Tile Panel System](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en)
    - [Phenolic](https://cncmetalcraft.com/phenolic?hsLang=en)
- [Custom Fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en)
- Our Work 
    - [View All Our Work](https://cncmetalcraft.com/our-work?hsLang=en)
    - [Composite Panel Gallery](https://cncmetalcraft.com/our-work/tag/composite-panel-gallery?hsLang=en)
    - [Plate Panel Gallery](https://cncmetalcraft.com/our-work/tag/plate-panel-gallery?hsLang=en)
    - [Column Covers Gallery](https://cncmetalcraft.com/our-work/tag/column-covers-gallery?hsLang=en)
    - [Tile Panel Gallery](https://cncmetalcraft.com/our-work/tag/tile-panel-gallery?hsLang=en)
    - [Phenolic Gallery](https://cncmetalcraft.com/our-work/tag/phenolic-gallery?hsLang=en)
- [About Us](https://cncmetalcraft.com/about-us?hsLang=en)
- [Contact](https://cncmetalcraft.com/contact-us?hsLang=en)

CNC Metalcraft® Fabrication

# Metal Panel Fabrication and Shipping to West Virginia

CNC Metalcraft® is the fabrication shop behind a lot of architectural metal that ends up on West Virginia buildings. Since 2005 we have cut, routed, formed and crated panels in over 75,000 sq ft across two Burnsville, MN buildings, then put them on trucks headed out of state.

[Request a Quote](https://cncmetalcraft.com/request-a-quote?hsLang=en)[Call 888.938.3356](tel:+18889383356)

■ Founded 2005■ 75,000+ sq ft in Burnsville, MN■ Column covers up to 15 ft■ Ships nationwide

## Fabricated parts we ship to West Virginia

- **Solid aluminum plate** (not a laminate) in .063 to .250 in. gauges, with perforated and stainless versions made in the same shop. More on [plate panel systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en).
- **Column covers** up to 15 ft per piece, and beam wraps to match; anything taller ships in sections with a stack joint. Details: [column cover systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en).
- **Architectural extrusions**, among them the proprietary Sure-Panel® aluminum extrusion system used to install rainscreen panels.
- **Custom metal**: shearing, bending, notching, rolling, punching and welding, and we can shear, form and roll material up to 16 ft. See [custom fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en).
- **S-Lock tile**: light-gauge tile with interlocking hemmed edges, up to 24 by 120 in. See [S-Lock tile](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en).
- **ACM/MCM composite panels**: routed and returned in our shop from 3, 4 and 6 mm sheet (FR or PE core, FR being the usual spec). See [composite panel systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en).

Joint types, specs and system choices for West Virginia are covered on the [Sure-Panel® West Virginia page](https://www.sure-panel.com/west-virginia-metal-panels). This page stays on the shop and the shipping.

## Freight from Burnsville to West Virginia

Charleston is roughly 900 miles from our dock by road, which works out to about 2 days of transit. *These are planning estimates only, not a carrier quote; the actual route, carrier and pickup date will change them.*

On that measure West Virginia ranks 19th closest of the 48 contiguous states to our shop; among its neighbors, Ohio is nearest to us (about 740 miles to its capital, also an estimate).

Two days of transit is easy to absorb if it is on the schedule from the start. Count it between the ship date and the day your West Virginia crew needs material.

## West Virginia energy code and climate facts

West Virginia commercial projects fall under ASHRAE 90.1-2013 according to the [DOE Building Energy Codes Program](https://www.energycodes.gov/status/states/west-virginia); the listed effective date is September 30, 2022 and enforcement is Mandatory Statewide. On the residential side the listing is 2015 IECC (start date August 1, 2022).

On the 2021 IECC climate map (PNNL-33270), West Virginia runs from zone 4 to zone 5: 36 counties in zone 4 and 19 in zone 5. Examples from the county tables: Summers County, zone 4; Brooke County, zone 5.

Code compliance and envelope design stay with the design team and the local code official; DOE listings can lag behind state action, so check the current edition before you bid.

## How a West Virginia order moves through the shop

1. **Send drawings and scope.** Square footage, system, material and color, plus the site address so we can plan freight.
2. **Shop drawings.** Unless you already have approved fabrication drawings, we draft shop drawings for your review and approval; every part gets a mark that matches the drawings.
3. **Fabrication.** If you supply approved fabrication drawings, fabrication takes 3 to 4 weeks. When we do the drafting, production runs about 6 to 8 weeks from approval of our shop drawings.
4. **Packing.** Each part carries its drawing mark, and crates are built to protect the finish over the haul.
5. **Freight and delivery.** We coordinate the shipment to your site and the delivery window.

Installers get parts that match the approved shop drawings mark for mark, and they can call the shop Monday through Friday, 7 to 4, with questions.

## Site receiving checklist

- Check every crate while the driver is still there: count against the packing list, then photograph and write down any damage on the delivery receipt.
- If indoor storage is not available, raise crates off the ground, tilt them so water drains, and cover them loosely.
- Open crates only as material is needed.
- Schedule each delivery close to its install date to keep storage time short.

## Cost

ACM fabrication starts at $6/SF, fabrication only. Freight to West Virginia, finishes, system and schedule all affect the final number, which we quote from your drawings.

## West Virginia fabrication FAQ

### How long does it take to fabricate and ship panels to West Virginia?

With approved fabrication drawings from you, fabrication takes 3 to 4 weeks. If we prepare the drafting, production takes about 6 to 8 weeks from the approval of our shop drawings. Then add freight: we estimate about 2 days by truck to Charleston. Transit figures are estimates, not a carrier quote.

### Which energy code does DOE list for West Virginia commercial buildings?

DOE lists ASHRAE 90.1-2013 for West Virginia commercial buildings, effective September 30, 2022, with enforcement shown as Mandatory Statewide. Confirm the current edition with the local code official.

### Can column covers taller than 15 ft ship to West Virginia?

Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts.

Nearby fabrication pages: [Kentucky](https://cncmetalcraft.com/metal-panel-fabrication/kentucky?hsLang=en), [Maryland](https://cncmetalcraft.com/metal-panel-fabrication/maryland?hsLang=en), [Ohio](https://cncmetalcraft.com/metal-panel-fabrication/ohio?hsLang=en), [Pennsylvania](https://cncmetalcraft.com/metal-panel-fabrication/pennsylvania?hsLang=en), [Virginia](https://cncmetalcraft.com/metal-panel-fabrication/virginia?hsLang=en). All states: [metal panel fabrication by state](https://cncmetalcraft.com/metal-panel-fabrication?hsLang=en).

## Request a quote for a West Virginia project

Send plans through our [quote request page](https://cncmetalcraft.com/request-a-quote?hsLang=en), or phone (952) 938-3356 / 888.938.3356, Monday to Friday from 7 to 4. You can also see finished buildings on [our work](https://cncmetalcraft.com/our-work?hsLang=en). CNC Metalcraft®, 11901 Riverwood Dr, Burnsville, MN 55337.

[Request a Quote](https://cncmetalcraft.com/request-a-quote?hsLang=en)

[![CNCmetalcraft-logo](https://cncmetalcraft.com/hubfs/CNCmetalcraft-logo.png)](https://cncmetalcraft.com?hsLang=en)

11901 Riverwood Dr  
Burnsville, MN 55337

- <https://www.facebook.com/CNCMetalcraft/>
- <https://www.instagram.com/cncmetalcraft/>
- <https://www.linkedin.com/company/cnc-metalcraft/>

### Quick Links

- [Leed](https://cncmetalcraft.com/leed)
- [Resources](https://cncmetalcraft.com/resources)
- [Documentation](https://cncmetalcraft.com/documentation)

### Stay in Touch

Copyright © 2026 CNC Metalcraft | All rights reserved | [Privacy Policy](https://cncmetalcraft.com/privacy-policy?hsLang=en) | [Terms of Use](https://cncmetalcraft.com/terms-and-conditions-of-use?hsLang=en) 

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://cncmetalcraft.com/metal-panel-fabrication/west-virginia#service",
  "@type" : "Service",
  "areaServed" : {
    "@type" : "State",
    "containedInPlace" : {
      "@type" : "Country",
      "name" : "United States"
    },
    "name" : "West Virginia"
  },
  "description" : "ACM, plate and column covers fabricated in Burnsville, MN and crated for West Virginia. About 900 mi to Charleston (estimate). Lead times and quotes.",
  "name" : "Architectural metal panel fabrication for West Virginia projects",
  "provider" : {
    "@id" : "https://cncmetalcraft.com/#org",
    "@type" : "LocalBusiness",
    "address" : {
      "@type" : "PostalAddress",
      "addressCountry" : "US",
      "addressLocality" : "Burnsville",
      "addressRegion" : "MN",
      "postalCode" : "55337",
      "streetAddress" : "11901 Riverwood Dr"
    },
    "name" : "CNC Metalcraft",
    "telephone" : "+1-952-938-3356",
    "url" : "https://cncmetalcraft.com/"
  },
  "serviceType" : "Architectural metal panel fabrication",
  "url" : "https://cncmetalcraft.com/metal-panel-fabrication/west-virginia"
}
```

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://cncmetalcraft.com/metal-panel-fabrication/west-virginia#faq",
  "@type" : "FAQPage",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "With approved fabrication drawings from you, fabrication takes 3 to 4 weeks. If we prepare the drafting, production takes about 6 to 8 weeks from the approval of our shop drawings. Then add freight: we estimate about 2 days by truck to Charleston. Transit figures are estimates, not a carrier quote."
    },
    "name" : "How long does it take to fabricate and ship panels to West Virginia?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "DOE lists ASHRAE 90.1-2013 for West Virginia commercial buildings, effective September 30, 2022, with enforcement shown as Mandatory Statewide. Confirm the current edition with the local code official."
    },
    "name" : "Which energy code does DOE list for West Virginia commercial buildings?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts."
    },
    "name" : "Can column covers taller than 15 ft ship to West Virginia?"
  } ],
  "url" : "https://cncmetalcraft.com/metal-panel-fabrication/west-virginia"
}
```