---
title: Arizona Metal Panel Fabrication & Freight | CNC Metalcraft®
description: ACM, plate and column covers fabricated in Burnsville, MN and crated for Arizona. About 1,520 mi to Phoenix (estimate). Lead times and quotes.
image: https://cncmetalcraft.com/hubfs/DSC016303_seamless-2048x1366.jpeg
---

Call us Today! [**888.938.3356**](tel:8889383356)

[![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png) ![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png)](https://cncmetalcraft.com?hsLang=en)

[![CNC Metalcraft® Architectural Metal Fabrication logo](https://cncmetalcraft.com/hs-fs/hubfs/cnc-metalcraft-logo-1000.png?width=300&height=73&name=cnc-metalcraft-logo-1000.png)](https://cncmetalcraft.com?hsLang=en)

<https://cncmetalcraft.com/metal-panel-fabrication/arizona#navbar_global>

- Systems 
    - [All Products](https://cncmetalcraft.com/our-products?hsLang=en)
    - [Composite Panel Systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en)
    - [Plate Panel Systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en)
    - [Column Cover Systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en)
    - [Sure-Panel® S-Lock Tile Panel System](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en)
    - [Phenolic](https://cncmetalcraft.com/phenolic?hsLang=en)
- [Custom Fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en)
- Our Work 
    - [View All Our Work](https://cncmetalcraft.com/our-work?hsLang=en)
    - [Composite Panel Gallery](https://cncmetalcraft.com/our-work/tag/composite-panel-gallery?hsLang=en)
    - [Plate Panel Gallery](https://cncmetalcraft.com/our-work/tag/plate-panel-gallery?hsLang=en)
    - [Column Covers Gallery](https://cncmetalcraft.com/our-work/tag/column-covers-gallery?hsLang=en)
    - [Tile Panel Gallery](https://cncmetalcraft.com/our-work/tag/tile-panel-gallery?hsLang=en)
    - [Phenolic Gallery](https://cncmetalcraft.com/our-work/tag/phenolic-gallery?hsLang=en)
- [About Us](https://cncmetalcraft.com/about-us?hsLang=en)
- [Contact](https://cncmetalcraft.com/contact-us?hsLang=en)

- Systems 
    - [All Products](https://cncmetalcraft.com/our-products?hsLang=en)
    - [Composite Panel Systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en)
    - [Plate Panel Systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en)
    - [Column Cover Systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en)
    - [Sure-Panel® S-Lock Tile Panel System](https://cncmetalcraft.com/sure-panel-s-lock-tile-panel-system?hsLang=en)
    - [Phenolic](https://cncmetalcraft.com/phenolic?hsLang=en)
- [Custom Fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en)
- Our Work 
    - [View All Our Work](https://cncmetalcraft.com/our-work?hsLang=en)
    - [Composite Panel Gallery](https://cncmetalcraft.com/our-work/tag/composite-panel-gallery?hsLang=en)
    - [Plate Panel Gallery](https://cncmetalcraft.com/our-work/tag/plate-panel-gallery?hsLang=en)
    - [Column Covers Gallery](https://cncmetalcraft.com/our-work/tag/column-covers-gallery?hsLang=en)
    - [Tile Panel Gallery](https://cncmetalcraft.com/our-work/tag/tile-panel-gallery?hsLang=en)
    - [Phenolic Gallery](https://cncmetalcraft.com/our-work/tag/phenolic-gallery?hsLang=en)
- [About Us](https://cncmetalcraft.com/about-us?hsLang=en)
- [Contact](https://cncmetalcraft.com/contact-us?hsLang=en)

CNC Metalcraft® Fabrication

# Metal Panel Fabrication and Shipping to Arizona

Founded in 2005, CNC Metalcraft® fabricates architectural metal in over 75,000 sq ft across two Burnsville, MN buildings. For Arizona projects we handle the shop side, from shop drawings through crating, and coordinate the freight to the jobsite.

[Request a Quote](https://cncmetalcraft.com/request-a-quote?hsLang=en)[Call 888.938.3356](tel:+18889383356)

■ Founded 2005■ 75,000+ sq ft in Burnsville, MN■ Column covers up to 15 ft■ Ships nationwide

## Fabricated parts we ship to Arizona

- **Custom sheet-metal work** such as trim, closures and one-off parts; the shop can shear, form and roll pieces up to 16 ft long. More on [custom fabrication](https://cncmetalcraft.com/custom-fabrication?hsLang=en).
- **ACM/MCM composite panels** in 3, 4 or 6 mm, CNC-routed with formed returns; FR core is the usual specification, PE is available. Details: [composite panel systems](https://cncmetalcraft.com/composite-panel-systems?hsLang=en).
- **Plate panels** cut and formed from solid aluminum, .063 to .250 in. thick, plus stainless and perforated plate. Details: [plate panel systems](https://cncmetalcraft.com/plate-panel-systems?hsLang=en).
- **Column covers and beam wraps**, one piece up to 15 ft tall, stacked in marked sections beyond that. More on [column cover systems](https://cncmetalcraft.com/column-cover-systems?hsLang=en).
- **Extrusion packages** that ship with the panels, including the Sure-Panel® rainscreen extrusion system.

For panel system details, the [Sure-Panel® Arizona page](https://www.sure-panel.com/arizona-metal-panels) is the place to start. Everything below is about how CNC Metalcraft® builds and ships the order.

## Getting crates to Arizona

By our estimate a truck covers about 1,520 miles to reach Phoenix, roughly 4 days on the road. *These are planning estimates only, not a carrier quote; the actual route, carrier and pickup date will change them.*

On that measure Arizona ranks 44th closest of the 48 contiguous states to our shop; among its neighbors, Colorado is nearest to us (about 830 miles to its capital, also an estimate).

Arizona is one of our longer truck routes. Add the transit days to the schedule early, and plan for crates to be staged on site for a while.

## What the Arizona code and climate data say

The [DOE Building Energy Codes Program](https://www.energycodes.gov/status/states/arizona) lists Arizona's commercial energy code as Home Rule and its residential code as Home Rule, with commercial enforcement shown as Jurisdictional. In practice the city or county that issues the permit decides which edition applies, so confirm it with that office.

On the 2021 IECC climate map (PNNL-33270), Arizona runs from zone 2 to zone 5: 5 counties in zone 2, 5 counties in zone 3, 2 counties in zone 4 and 3 in zone 5. Examples from the county tables: La Paz County, zone 2; Gila County, zone 4; Navajo County, zone 5.

These figures come from DOE and PNNL as of November 2026 and can trail recent state updates. The architect and the Arizona code official have the final word; we fabricate to what they approve.

## Steps for an Arizona order

1. **Share the bid set.** Elevations, panel areas, finish and the delivery location are enough to start a quote.
2. **Drafting and approval.** If drafting is in our scope, our team prepares shop drawings, and production starts once they come back approved.
3. **Fabrication.** If you supply approved fabrication drawings, fabrication takes 3 to 4 weeks. When we do the drafting, production runs about 6 to 8 weeks from approval of our shop drawings.
4. **Marking and crating.** Parts are marked to the shop drawings and packed to protect finished faces and returns.
5. **Freight and delivery.** We coordinate the shipment to your site and the delivery window.

Questions from the Arizona installation crew about marks or drawings can come straight to the shop during business hours, Monday through Friday, 7 to 4.

## When the truck arrives

- Inspect crates before the driver leaves, count them against the packing list, and note and photograph any damage on the delivery paperwork.
- Stage crates indoors when you can; otherwise keep them off the ground, tilted to drain and loosely tarped.
- Leave panels crated until the crew is ready to hang them.
- On long routes, add the transit days to the schedule before you set the install date.

## Cost

ACM fabrication starts at $6/SF (fabrication only). Full project pricing depends on the system, size, finish and schedule, and we quote it from drawings, with freight to Arizona priced separately.

## Arizona fabrication FAQ

### How long does it take to fabricate and ship panels to Arizona?

It depends on who draws the job. Send approved fabrication drawings and fabrication takes 3 to 4 weeks; have us do the drafting and production runs about 6 to 8 weeks once you approve our shop drawings. Then add freight: we estimate about 4 days by truck to Phoenix. Transit figures are estimates, not a carrier quote.

### Which energy code does DOE list for Arizona commercial buildings?

DOE lists Arizona's commercial energy code as Home Rule, with enforcement shown as Jurisdictional, so the local jurisdiction issuing the permit sets the edition. Confirm it with that office.

### Can column covers taller than 15 ft ship to Arizona?

Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts.

## Start an Arizona quote

Send plans through our [quote request page](https://cncmetalcraft.com/request-a-quote?hsLang=en), or phone (952) 938-3356 / 888.938.3356, Monday to Friday from 7 to 4. You can also see finished buildings on [our work](https://cncmetalcraft.com/our-work?hsLang=en). CNC Metalcraft®, 11901 Riverwood Dr, Burnsville, MN 55337.

Nearby fabrication pages: [California](https://cncmetalcraft.com/metal-panel-fabrication/california?hsLang=en), [Colorado](https://cncmetalcraft.com/metal-panel-fabrication/colorado?hsLang=en), [Nevada](https://cncmetalcraft.com/metal-panel-fabrication/nevada?hsLang=en), [New Mexico](https://cncmetalcraft.com/metal-panel-fabrication/new-mexico?hsLang=en), [Utah](https://cncmetalcraft.com/metal-panel-fabrication/utah?hsLang=en). All states: [metal panel fabrication by state](https://cncmetalcraft.com/metal-panel-fabrication?hsLang=en).

[![CNCmetalcraft-logo](https://cncmetalcraft.com/hubfs/CNCmetalcraft-logo.png)](https://cncmetalcraft.com?hsLang=en)

11901 Riverwood Dr  
Burnsville, MN 55337

- <https://www.facebook.com/CNCMetalcraft/>
- <https://www.instagram.com/cncmetalcraft/>
- <https://www.linkedin.com/company/cnc-metalcraft/>

### Quick Links

- [Leed](https://cncmetalcraft.com/leed)
- [Resources](https://cncmetalcraft.com/resources)
- [Documentation](https://cncmetalcraft.com/documentation)

### Stay in Touch

Copyright © 2026 CNC Metalcraft | All rights reserved | [Privacy Policy](https://cncmetalcraft.com/privacy-policy?hsLang=en) | [Terms of Use](https://cncmetalcraft.com/terms-and-conditions-of-use?hsLang=en) 

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://cncmetalcraft.com/metal-panel-fabrication/arizona#service",
  "@type" : "Service",
  "areaServed" : {
    "@type" : "State",
    "containedInPlace" : {
      "@type" : "Country",
      "name" : "United States"
    },
    "name" : "Arizona"
  },
  "description" : "ACM, plate and column covers fabricated in Burnsville, MN and crated for Arizona. About 1,520 mi to Phoenix (estimate). Lead times and quotes.",
  "name" : "Architectural metal panel fabrication for Arizona projects",
  "provider" : {
    "@id" : "https://cncmetalcraft.com/#org",
    "@type" : "LocalBusiness",
    "address" : {
      "@type" : "PostalAddress",
      "addressCountry" : "US",
      "addressLocality" : "Burnsville",
      "addressRegion" : "MN",
      "postalCode" : "55337",
      "streetAddress" : "11901 Riverwood Dr"
    },
    "name" : "CNC Metalcraft",
    "telephone" : "+1-952-938-3356",
    "url" : "https://cncmetalcraft.com/"
  },
  "serviceType" : "Architectural metal panel fabrication",
  "url" : "https://cncmetalcraft.com/metal-panel-fabrication/arizona"
}
```

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://cncmetalcraft.com/metal-panel-fabrication/arizona#faq",
  "@type" : "FAQPage",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "It depends on who draws the job. Send approved fabrication drawings and fabrication takes 3 to 4 weeks; have us do the drafting and production runs about 6 to 8 weeks once you approve our shop drawings. Then add freight: we estimate about 4 days by truck to Phoenix. Transit figures are estimates, not a carrier quote."
    },
    "name" : "How long does it take to fabricate and ship panels to Arizona?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "DOE lists Arizona's commercial energy code as Home Rule, with enforcement shown as Jurisdictional, so the local jurisdiction issuing the permit sets the edition. Confirm it with that office."
    },
    "name" : "Which energy code does DOE list for Arizona commercial buildings?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Yes. Column covers are fabricated up to 15 ft in a single piece; taller covers are made in sections with a stack joint and shipped as separately marked parts."
    },
    "name" : "Can column covers taller than 15 ft ship to Arizona?"
  } ],
  "url" : "https://cncmetalcraft.com/metal-panel-fabrication/arizona"
}
```